Marine Trades Center Phase 2: Port of Port Angeles
Facet and Kennedy Jenks recently finalized the design for an asphalt roadway for a 500-ton Travelift vehicle with the option for reinforced concrete wheel paths, asphalt access roadways, and three concrete stormwater treatment tanks for the Marine Trades Center Phase 2 Development for the Port of Port Angeles. Work completed at this time includes structural plans and details, cost estimate, specifications and calculations. Project is to begin construction in July 2024 and will finish January 2024. Facet has been engaged during the pre-construction phase with submittals reviews and RFI’s. Facet will be on-site to perform construction inspection for all roadways and stormwater tank construction. The purpose of the project is to get new tenants into a previously undeveloped portion of the port waterfront property.
Location:
Port Angeles, WA
Client:
Port of Port Angeles
Partner Firm:
Services Provided:
Marine Engineering & Infrastructure
Design of Travelift roadway with reinforced concrete wheel paths
Asphalt access roadways design
Structural plans, details, and calculations
Stormwater Management
Design of three concrete stormwater treatment tanks
Construction Support
Cost estimating, specifications, and pre-construction submittal reviews
RFI responses and construction inspection for roadways and stormwater tanks
Facet and Kennedy Jenks designed the Travelift roadway, asphalt access roads, and stormwater treatment infrastructure to support new tenants at the Port of Port Angeles. Their work included structural plans, cost estimating, pre-construction reviews, and on-site construction inspection.