Blake Island State Park Marina Improvements Pre-Design: Kitsap County

 

Facet provided all planning and engineering services related to a comprehensive marina needs study through a pre-design process. The Blake Island Marina project proposed to dredge sand and sediment from the entrance channel and Blake Island Marina; replace moorage piers, floats, gangways, boat pump out platform, and access routes to comply with federal accessibility requirements within the marina; examine reconfigurations of moorage to be more efficient and flexible; examine breakwater improvements; remove creosote from the pier/marina; and construct a permanent cargo ramp for the maintenance vessel.

Facet and the design team completed the Master Planning in stages by identifying issues and concerns, exploring alternative approaches, and developing a preferred alternative. Washington State Parks is working through the final recommendations for the project, including budgeting and Commission approval, to guide future improvement investments and leadership decisions at Blake Island. The final Master Plan will explore the following elements to guide development at the park: Site Evaluation, Existing Conditions, Opportunities and Constraints Analysis, Operational Needs, Mapping, and Consultation. Washington State Parks operated the experiences known as Tillicum Village at Blake Island for over forty years. Facet is proud to have helped guide the parks in continuing this legacy..

Location:

Kitsap County

Client:

Washington State Parks

Services Provided:

  • Marine Engineering & Planning

    • Pre-design planning and engineering for marina improvements, including dredging, moorage reconfiguration, and breakwater analysis

  • Infrastructure & Accessibility Upgrades

    • Replacement of piers, floats, gangways, and access routes to meet federal accessibility standards

  • Environmental & Regulatory Compliance

    • Removal of creosote-treated materials and evaluation of long-term sustainability measures

  • Master Planning & Operational Strategy

    • Site evaluation, mapping, operational needs assessment, and coordination with Washington State Parks to guide future investment decisions.

 

Facet guided the master planning for Blake Island Marina, addressing access, moorage, and infrastructure needs. The project set the foundation for future improvements and long-term park operations.